How the repair works

Seven steps, one crew, a written scope before we touch a wall. This is the sequence every job follows, no exceptions.

Step 1: Inspection & moisture survey

Seven steps, no shortcuts

Follow the crew from first inspection to final walkthrough.

  1. Inspection & moisture survey

    We probe the substrate and check for trapped moisture with a calibrated meter, not a guess from the sidewalk.

    Typical duration
    30–45 minutes, on-site
    Standard / material
    ASTM D4263 moisture screen
  2. Written fixed-price scope

    One price for materials and labor, itemized before you sign. No change orders once the crew shows up.

    Typical duration
    Delivered within 24 hours
    Standard / material
    Line-itemized against our current price book
  3. Protection & prep

    Landscaping, windows, walkways, and AC units get masked before any tool touches the wall.

    Typical duration
    1–2 hours
    Standard / material
    6-mil poly + tape, manufacturer prep spec
  4. Remove failed material

    We cut back to sound substrate. No shortcuts, no skim-coating over rot.

    Typical duration
    Half a day to 2 days, by scope
    Standard / material
    Cut to sound edge, ASTM C1063 substrate check
  5. Lath, WRB & flashing correction

    We fix the drainage plane first. A new coat over bad lath just fails again in a season.

    Typical duration
    1–3 days, by scope
    Standard / material
    ASTM C1063 lath + Grade D building paper
  6. Scratch, brown & finish coats

    Three coats to spec, each cured before the next goes on. Parex and Omega finish systems, applied by hand.

    Typical duration
    5–10 days, cure time included
    Standard / material
    ASTM C926 three-coat application
  7. Texture match, seal & walkthrough

    We match your existing texture, seal the work, and walk the job with you before we call it done.

    Typical duration
    Half a day, plus final sign-off
    Standard / material
    Manufacturer texture match + final walkthrough sign-off