نظام كامل من طبقة التثبيت والطبقة الوسطى وطبقة التشطيب، مُركَّب وفق الكود على الجدران الجديدة.
We do not cut corners with fast 1-coat synthetic shortcuts. Every new stucco installation follows Florida Building Code Chapter 25 for 7/8" nominal total thickness.
Two distinct planes of heavy-duty weather barrier installed shingle-lap to direct any intruding moisture outward to the foundation weep screed.
Mechanically fastened into wall framing studs with corrosion-resistant screws. Includes zinc corner beads and control joints to manage expansion.
Troweled fully through lath keys and horizontally scored to provide mechanical interlocking keys for the subsequent coat. 48-hr moist cure.
Brought true to grounds and screeded flush to create a dead-flat, plumb exterior surface. Hydration-cured for maximum compressive strength.
The final visible texture layer (knockdown, sand-float, smooth or lace) with UV-stable pigments that never fade or chalk under Florida sun.
سبع خطوات، طاقم واحد، ونطاق عمل مكتوب قبل لمس أي جدار.
نعمل حاليًا على تحديث الأسعار — اتصل بنا للحصول على نطاق في اليوم نفسه.
اتصل الآنأرسل لنا صور الأضرار للحصول على نصائح خبرائنا أو احجز معاينة ميدانية مجانية للحصول على عرض سعر مكتوب.